{"id":20018827,"date":"2016-05-12T07:00:16","date_gmt":"2016-05-12T07:00:16","guid":{"rendered":"https:\/\/www.thethirdpole.net\/?p=18827"},"modified":"2021-01-03T21:36:40","modified_gmt":"2021-01-03T16:06:40","slug":"nepals-eternal-quest-for-hydropower-challenges-and-quakes","status":"publish","type":"post","link":"https:\/\/dialogue.earth\/en\/energy\/nepals-eternal-quest-for-hydropower-challenges-and-quakes\/","title":{"rendered":"Nepal\u2019s eternal quest for hydropower \u2013 challenges and quakes"},"content":{"rendered":"<p>With 6,000 rivers and steep Himalayan slopes, it\u2019s not surprising that Nepal links its future to hydropower development. But this is not new. The oldest hydropower scheme in Nepal, at <a href=\"https:\/\/en.wikipedia.org\/wiki\/Pharping_Hydropower_station\">Pharping<\/a> near Kathmandu, was constructed in 1911 at the command of then prime minister <a href=\"https:\/\/en.wikipedia.org\/wiki\/Chandra_Shumsher_Jang_Bahadur_Rana\">Chandra Shamsher Jang Bahadur Rana<\/a>. Since the 1960s, private developers and INGOs alike have canvassed the country prospecting for good hydropower sites. Hundreds of millions of dollars have been invested in hydropower planning in the last two decades alone. And yet today, <a href=\"http:\/\/www.nea.org.np\/images\/supportive_docs\/year-review-2014-15.pdf\">Nepal generates a meagre 800MW<\/a> of hydroelectricity while 60% of the country still has no access to electricity and urban areas require up to 16 hours of load shedding (planned power cuts) during the dry season.<\/p>\n<p>These depressing hydropower statistics, however, belie the strength of recent proclamations made by political parties. The <a href=\"http:\/\/kathmandupost.ekantipur.com\/news\/2016-02-15\/ambition-without-vision.html\">Nepali Congress<\/a> party vowed to generate 5,000MW of electricity within five years. The <a href=\"http:\/\/www.nepalenergyforum.com\/parties-incredible-hydro-power-promises\/\">United Marxist-Leninists<\/a> followed up by promising to end load shedding in the country by completing all major hydropower projects within ten years. Not to be outdone, the UCPN-Maoist party then said it would end load shedding in three years and produce 10,000MW in the next ten years.<\/p>\n<p>Understandably many people in Nepal and in India, who would like to import this energy, are committed to overcoming the impediments to developing Nepal\u2019s hydropower. When I survey the roster of concerns I hear from private sector and civil society hydropower experts alike, the challenges seem to fall into one of three categories: institutional, political, and market problems. Of course, these divisions are not neat and complete; each one is heavily influenced by the others.<\/p>\n<h2><strong>Institutional challenges<\/strong><\/h2>\n<p>At hydropower conferences across Kathmandu, private hydro developers regularly line up to complain about the current process for obtaining clearances for each stage of construction across various ministries. They argue that the numerous regulatory hurdles and the slow bureaucratic approvals cut too deeply into their resources and time to recoup investments. Not only do they suffer, the argument goes, but this also dissuades foreign investors who take their projects and dollars elsewhere.<\/p>\n<p>Regulatory problems aside, other potential hazards lurk within a legal structure that is sorely out of date with regard to hydropower and natural resource use. For eight years Nepal operated under an interim constitution that in many places contradicted previous acts and policies related to hydropower. The Indian backed <a href=\"http:\/\/www.gmrgroup.in\/energy-upper-karnali-project.aspx\">Upper Karnali<\/a> project, for example, was <a href=\"https:\/\/dialogue.earth\/2016\/03\/17\/will-china-invest-in-nepals-hydropower-plants\/\">approved in 2014<\/a> by the Investment Board of Nepal. However, critics point out that article 156 of the interim constitution requires two-thirds parliamentary approval for all agreements relating to natural resources. For this reason, one Nepali legal scholar told me, it is conceivable that every hydropower project constructed since 2007 could face legal challenges that could delay construction.<\/p>\n<p>At the heart of Nepal\u2019s hydroelectric conflicts sits the <a href=\"http:\/\/www.nea.org.np\/\">Nepal Electricity Authority<\/a> (NEA), a World Bank project from 1983 that provided operational efficiencies when the total demand in Nepal hovered around 100MW. Today, it is generally regarded as a <a href=\"http:\/\/kathmandupost.ekantipur.com\/news\/2016-02-15\/ambition-without-vision.html\">sclerotic, bloated and corrupt<\/a> body that cannot properly manage Nepal\u2019s hydropower future. Defenders of NEA\u2014and there are a few\u2014say the institution has its hands tied financially by artificially low tariff rates that ensure most Nepalis who live on the grid can afford to buy its energy. These low tariffs mean that NEA sits in the red year after year, buying energy from individual projects that it cannot sell at a profitable rate.<\/p>\n<h2><strong>Political problems<\/strong><\/h2>\n<p>The extreme volatility that has characterized Nepali politics since 1990 \u2014 25 governments in that time and a long running civil war \u2014 has perhaps posed the largest challenge to hydropower development as party leaders have devoted more attention to obtaining ministry appointments rather than generating megawatts. As Kathmandu-based journalist Thomas Bell has written, \u201cThe starting point to think about Nepal\u2019s failed development is that the country\u2019s rulers have never been motivated by the national interest.\u201d <a href=\"http:\/\/www.inseconline.org\/linkedfile\/Bill%20Of%20Constitution%202015%20Sept.pdf\">The new constitution<\/a> in 2015 augured fresh change, but was <a href=\"http:\/\/www.bbc.com\/news\/world-asia-34280015\">quickly met<\/a> with a six-month blockade along its southern border as Nepalis and Indians alike objected to provisions regarding citizenship and plans for establishing a federalist structure.<\/p>\n<p>Behind this front stage of turmoil and fragility sits India, a dominating silent presence in all Nepali affairs. Rumours vary wildly as to the extent of India\u2019s influence in the halls of <a href=\"https:\/\/en.wikipedia.org\/wiki\/Singha_Durbar\">Singha Durbar<\/a>, but even the most pro-Indian Nepalis express wariness about allowing India too much of a hand in Nepali politics and on its natural resources. As a result, Indian-backed hydropower projects, such as Upper Karnali and Arun-3, have met significant resistance, primarily from the Maoist parties who preach a nationalist and isolationist message to the country. The <a href=\"http:\/\/www.gmrgroup.in\/home.aspx\">GMR Consortium<\/a>, which has the license to build Upper Karnali, was forced to stop construction during the blockade as Nepali opponents began vandalizing their assets in Kathmandu and Surkhet.<\/p>\n<h2><strong>Market hassles<\/strong><\/h2>\n<p>There is an existential cloud that hangs over Nepal\u2019s hydro development which owes its formation to the general youth of the country\u2019s electricity market: energy pricing. The NEA is charged with generating the country\u2019s energy demand forecasts, which are greeted with tremendous scepticism. <a href=\"http:\/\/thehimalayantimes.com\/business\/ministry-energy-moe-nepal-electricity-authority-nea-odds-demand-projections\/\">Developers and government ministries claim<\/a> that the NEA lowballs the forecasts to avoid taking on more power purchasing agreements, while the NEA claims developers overstate this potential market in order to develop projects that may generate more electricity than the country can absorb or export. Beyond that, these parties quibble over pricing and how to establish rates that will reward developers and be attractive to foreign and domestic consumers. To date, that Golden Mean has proved elusive and will remain so at least until Nepal can get one of its mega projects online and begin power trading with India in earnest.<\/p>\n<p>Finally, earthquake risks in the Himalayas had been the elephant in the corner for many years until it burst out in the form of a <a href=\"https:\/\/dialogue.earth\/2016\/04\/24\/photo-story-one-year-later-nepals-quake-survivors-still-homeless\/\">7.8 magnitude earthquake in April 2015,<\/a> causing incalculable damage and reigniting long-ignored concerns about the suitability of building dams in this region. The quake also stirred serious attention from some lawmakers. Writing in the <a href=\"http:\/\/dotearth.blogs.nytimes.com\/2015\/05\/25\/one-two-punch-of-earthquakes-and-landslides-exposes-hydropower-vulnerability-in-nepal\/?_r=0\">New York Times<\/a>, <a href=\"https:\/\/en.wikipedia.org\/wiki\/Gagan_Thapa\">Gagan Thapa<\/a>, a Nepali Congress member of parliament, suggested that the country\u2019s ardent focus on hydropower may be mislaid: \u201cWhat is clear is that Nepal cannot afford to delay diversifying its energy portfolio\u2026 [t]he norm should be the development of microgrids supplied by a mix of electricity sources (solar, biomass, clean waste incinerators, etc.).\u201d Talk of this kind had long been absent from discussion of Nepali energy development.<\/p>\n<p>While the blockade has been lifted and relief work moves forward, it is still difficult to make predictions about how energy development in Nepal will be transformed by the earthquake and the country\u2019s new constitution. But seismicity will certainly now have a prominent place in all high-level energy discussions. If anyone needed a reminder of the need for this refocus, Thapa said, \u201cWhen the grid went offline after the quake, even in the capital the only public lights that stayed on were solar.\u201d<\/p>\n<p>And a final word on China\u2019s nebulous presence in Nepali hydropower seems important to include here. While Chinese companies like Sinohydro have participated in some small to medium projects, such as the <a href=\"http:\/\/www.gmrgroup.in\/energy-upper-marsyangdi-project.aspx\">Upper Marsyangdi<\/a> in central Nepal, their intentions remain somewhat mysterious. State owned China Three Gorges Corporation acquired the license to build the West Seti project in 2013 and then immediately went silent for the next year. In late 2014 and early 2015 Three Gorges resumed preliminary studies at the West Seti site and then again withdrew after the earthquakes and did not resume talks with the <a href=\"http:\/\/kathmandupost.ekantipur.com\/printedition\/news\/2016-03-16\/nea-chinas-cwe-moving-closer-on-west-seti-project.html\">Nepali government until early 2016<\/a>.<\/p>\n<p><a href=\"https:\/\/dialogue.earth\/2016\/03\/17\/will-china-invest-in-nepals-hydropower-plants\/\">See also: Will China invest in Nepal\u2019s hydropower plants<\/a>?<\/p>\n<p>Some <a href=\"http:\/\/www.business-standard.com\/article\/politics\/modis-1-bn-loan-to-nepal-aimed-at-lessening-chinese-influence-114080401017_1.html\">observers<\/a> have suggested that China\u2019s increasing interest in Nepali hydropower could compel India to become more friendly in its negotiations and politics with Nepal. In fact, many cited Modi\u2019s USD 1 billion dollar soft loan to Nepal as evidence of <a href=\"http:\/\/www.hindustantimes.com\/india\/the-chinese-advice-behind-prachanda-s-u-turn-on-support-to-nepal-govt\/story-4sdNKxZxTu3QRMDdfcnjlN.html\">India\u2019s concerns about Chinese influence<\/a>. But given China\u2019s unpredictable stance on Nepali hydropower to date, that hope may be a bit premature.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>After more than a century, Nepal has little to show from its attempts to tap the vast hydropower potential of its Himalayan rivers \u2013 are things finally about to change?<\/p>\n","protected":false},"author":581,"featured_media":20018828,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[757],"tags":[17073,20000022,554],"hashtags":[],"country":[20000110,20000111,20000113],"class_list":["post-20018827","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-energy","tag-energy-transition","tag-himalayas","tag-hydropower","country-china","country-india","country-nepal"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v26.0 (Yoast SEO v26.0) - https:\/\/yoast.com\/wordpress\/plugins\/seo\/ -->\n<title>Nepal\u2019s eternal quest for hydropower \u2013 challenges and quakes | Dialogue Earth<\/title>\n<meta name=\"description\" content=\"After more than a century, Nepal has little to show from its attempts to tap the vast hydropower potential of its Himalayan rivers \u2013 are things finally about to change?\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/dialogue.earth\/en\/energy\/nepals-eternal-quest-for-hydropower-challenges-and-quakes\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Nepal\u2019s eternal quest for hydropower \u2013 challenges and quakes\" \/>\n<meta property=\"og:description\" content=\"After more than a century, Nepal has little to show from its attempts to tap the vast hydropower potential of its Himalayan rivers \u2013 are things finally about to change?\" \/>\n<meta property=\"og:url\" content=\"https:\/\/dialogue.earth\/en\/energy\/nepals-eternal-quest-for-hydropower-challenges-and-quakes\/\" \/>\n<meta property=\"og:site_name\" content=\"Dialogue Earth\" \/>\n<meta property=\"article:published_time\" content=\"2016-05-12T07:00:16+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2021-01-03T16:06:40+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/dialogue.earth\/content\/uploads\/2016\/05\/15803710913_01adf7a8ca_k.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"2048\" \/>\n\t<meta property=\"og:image:height\" content=\"1365\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"Beth Walker\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\/\/dialogue.earth\/en\/energy\/nepals-eternal-quest-for-hydropower-challenges-and-quakes\/#article\",\"isPartOf\":{\"@id\":\"https:\/\/dialogue.earth\/en\/energy\/nepals-eternal-quest-for-hydropower-challenges-and-quakes\/\"},\"author\":{\"name\":\"Beth Walker\",\"@id\":\"https:\/\/dialogue.earth\/en\/#\/schema\/person\/697038c567af68386b9b2acf2eb79870\"},\"headline\":\"Nepal\u2019s eternal quest for hydropower \u2013 challenges and quakes\",\"datePublished\":\"2016-05-12T07:00:16+00:00\",\"dateModified\":\"2021-01-03T16:06:40+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\/\/dialogue.earth\/en\/energy\/nepals-eternal-quest-for-hydropower-challenges-and-quakes\/\"},\"wordCount\":1349,\"commentCount\":3,\"publisher\":{\"@id\":\"https:\/\/dialogue.earth\/en\/#organization\"},\"image\":{\"@id\":\"https:\/\/dialogue.earth\/en\/energy\/nepals-eternal-quest-for-hydropower-challenges-and-quakes\/#primaryimage\"},\"thumbnailUrl\":\"https:\/\/dialogue.earth\/content\/uploads\/2016\/05\/15803710913_01adf7a8ca_k.jpg\",\"keywords\":[\"Energy transition\",\"Himalayas\",\"Hydropower\"],\"articleSection\":[\"Energy\"],\"inLanguage\":\"en\",\"potentialAction\":[{\"@type\":\"CommentAction\",\"name\":\"Comment\",\"target\":[\"https:\/\/dialogue.earth\/en\/energy\/nepals-eternal-quest-for-hydropower-challenges-and-quakes\/#respond\"]}]},{\"@type\":\"WebPage\",\"@id\":\"https:\/\/dialogue.earth\/en\/energy\/nepals-eternal-quest-for-hydropower-challenges-and-quakes\/\",\"url\":\"https:\/\/dialogue.earth\/en\/energy\/nepals-eternal-quest-for-hydropower-challenges-and-quakes\/\",\"name\":\"Nepal\u2019s eternal quest for hydropower \u2013 challenges and quakes | Dialogue Earth\",\"isPartOf\":{\"@id\":\"https:\/\/dialogue.earth\/en\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\/\/dialogue.earth\/en\/energy\/nepals-eternal-quest-for-hydropower-challenges-and-quakes\/#primaryimage\"},\"image\":{\"@id\":\"https:\/\/dialogue.earth\/en\/energy\/nepals-eternal-quest-for-hydropower-challenges-and-quakes\/#primaryimage\"},\"thumbnailUrl\":\"https:\/\/dialogue.earth\/content\/uploads\/2016\/05\/15803710913_01adf7a8ca_k.jpg\",\"datePublished\":\"2016-05-12T07:00:16+00:00\",\"dateModified\":\"2021-01-03T16:06:40+00:00\",\"description\":\"After more than a century, Nepal has little to show from its attempts to tap the vast hydropower potential of its Himalayan rivers \u2013 are things finally about to change?\",\"breadcrumb\":{\"@id\":\"https:\/\/dialogue.earth\/en\/energy\/nepals-eternal-quest-for-hydropower-challenges-and-quakes\/#breadcrumb\"},\"inLanguage\":\"en\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/dialogue.earth\/en\/energy\/nepals-eternal-quest-for-hydropower-challenges-and-quakes\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en\",\"@id\":\"https:\/\/dialogue.earth\/en\/energy\/nepals-eternal-quest-for-hydropower-challenges-and-quakes\/#primaryimage\",\"url\":\"https:\/\/dialogue.earth\/content\/uploads\/2016\/05\/15803710913_01adf7a8ca_k.jpg\",\"contentUrl\":\"https:\/\/dialogue.earth\/content\/uploads\/2016\/05\/15803710913_01adf7a8ca_k.jpg\",\"width\":2048,\"height\":1365,\"caption\":\"Kali Gandaki \\\"A\\\" Hydroelectric Project in Nepal. (Photo: Asian Development Bank)\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\/\/dialogue.earth\/en\/energy\/nepals-eternal-quest-for-hydropower-challenges-and-quakes\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\/\/dialogue.earth\/en\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Nepal\u2019s eternal quest for hydropower \u2013 challenges and quakes\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\/\/dialogue.earth\/en\/#website\",\"url\":\"https:\/\/dialogue.earth\/en\/\",\"name\":\"Dialogue Earth\",\"description\":\"Global climate and environment news\",\"publisher\":{\"@id\":\"https:\/\/dialogue.earth\/en\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\/\/dialogue.earth\/en\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en\"},{\"@type\":\"Organization\",\"@id\":\"https:\/\/dialogue.earth\/en\/#organization\",\"name\":\"\u5bf9\u8bdd\u5730\u7403\",\"url\":\"https:\/\/dialogue.earth\/en\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en\",\"@id\":\"https:\/\/dialogue.earth\/en\/#\/schema\/logo\/image\/\",\"url\":\"https:\/\/dialogue.earth\/content\/uploads\/2024\/04\/Dialogue-Earth-Symbol-Logo_Black-Text.png\",\"contentUrl\":\"https:\/\/dialogue.earth\/content\/uploads\/2024\/04\/Dialogue-Earth-Symbol-Logo_Black-Text.png\",\"width\":256,\"height\":256,\"caption\":\"\u5bf9\u8bdd\u5730\u7403\"},\"image\":{\"@id\":\"https:\/\/dialogue.earth\/en\/#\/schema\/logo\/image\/\"},\"sameAs\":[\"https:\/\/twitter.com\/DialogueEarth_\",\"\",\"https:\/\/www.facebook.com\/DialogueEarth.English\",\"https:\/\/www.instagram.com\/dialogue.earth\/\",\"https:\/\/www.linkedin.com\/company\/dialogueearth\/\"],\"publishingPrinciples\":\"https:\/\/dialogue.earth\/en\/about\/\"},{\"@type\":\"Person\",\"@id\":\"https:\/\/dialogue.earth\/en\/#\/schema\/person\/697038c567af68386b9b2acf2eb79870\",\"name\":\"Beth Walker\",\"description\":\"Beth Walker is chinadialogue\u2019s culture editor. She is also editor of thethirdpole.net. She has researched and written about Asia\u2019s international rivers for many years, and has lived and worked in Yunnan province. She studied Chinese at Oxford University and Development Management at the London School of Economics. You can follow her on Twitter at @beth_wa\",\"url\":\"https:\/\/dialogue.earth\/en\/author\/bethwalker\/\",\"sameAs\":[\"https:\/\/dialogue.earth\/en\/author\/christopher-butler\/\"]}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"Nepal\u2019s eternal quest for hydropower \u2013 challenges and quakes | Dialogue Earth","description":"After more than a century, Nepal has little to show from its attempts to tap the vast hydropower potential of its Himalayan rivers \u2013 are things finally about to change?","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/dialogue.earth\/en\/energy\/nepals-eternal-quest-for-hydropower-challenges-and-quakes\/","og_locale":"en_US","og_type":"article","og_title":"Nepal\u2019s eternal quest for hydropower \u2013 challenges and quakes","og_description":"After more than a century, Nepal has little to show from its attempts to tap the vast hydropower potential of its Himalayan rivers \u2013 are things finally about to change?","og_url":"https:\/\/dialogue.earth\/en\/energy\/nepals-eternal-quest-for-hydropower-challenges-and-quakes\/","og_site_name":"Dialogue Earth","article_published_time":"2016-05-12T07:00:16+00:00","article_modified_time":"2021-01-03T16:06:40+00:00","og_image":[{"width":2048,"height":1365,"url":"https:\/\/dialogue.earth\/content\/uploads\/2016\/05\/15803710913_01adf7a8ca_k.jpg","type":"image\/jpeg"}],"author":"Beth Walker","twitter_card":"summary_large_image","schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/dialogue.earth\/en\/energy\/nepals-eternal-quest-for-hydropower-challenges-and-quakes\/#article","isPartOf":{"@id":"https:\/\/dialogue.earth\/en\/energy\/nepals-eternal-quest-for-hydropower-challenges-and-quakes\/"},"author":{"name":"Beth Walker","@id":"https:\/\/dialogue.earth\/en\/#\/schema\/person\/697038c567af68386b9b2acf2eb79870"},"headline":"Nepal\u2019s eternal quest for hydropower \u2013 challenges and quakes","datePublished":"2016-05-12T07:00:16+00:00","dateModified":"2021-01-03T16:06:40+00:00","mainEntityOfPage":{"@id":"https:\/\/dialogue.earth\/en\/energy\/nepals-eternal-quest-for-hydropower-challenges-and-quakes\/"},"wordCount":1349,"commentCount":3,"publisher":{"@id":"https:\/\/dialogue.earth\/en\/#organization"},"image":{"@id":"https:\/\/dialogue.earth\/en\/energy\/nepals-eternal-quest-for-hydropower-challenges-and-quakes\/#primaryimage"},"thumbnailUrl":"https:\/\/dialogue.earth\/content\/uploads\/2016\/05\/15803710913_01adf7a8ca_k.jpg","keywords":["Energy transition","Himalayas","Hydropower"],"articleSection":["Energy"],"inLanguage":"en","potentialAction":[{"@type":"CommentAction","name":"Comment","target":["https:\/\/dialogue.earth\/en\/energy\/nepals-eternal-quest-for-hydropower-challenges-and-quakes\/#respond"]}]},{"@type":"WebPage","@id":"https:\/\/dialogue.earth\/en\/energy\/nepals-eternal-quest-for-hydropower-challenges-and-quakes\/","url":"https:\/\/dialogue.earth\/en\/energy\/nepals-eternal-quest-for-hydropower-challenges-and-quakes\/","name":"Nepal\u2019s eternal quest for hydropower \u2013 challenges and quakes | Dialogue Earth","isPartOf":{"@id":"https:\/\/dialogue.earth\/en\/#website"},"primaryImageOfPage":{"@id":"https:\/\/dialogue.earth\/en\/energy\/nepals-eternal-quest-for-hydropower-challenges-and-quakes\/#primaryimage"},"image":{"@id":"https:\/\/dialogue.earth\/en\/energy\/nepals-eternal-quest-for-hydropower-challenges-and-quakes\/#primaryimage"},"thumbnailUrl":"https:\/\/dialogue.earth\/content\/uploads\/2016\/05\/15803710913_01adf7a8ca_k.jpg","datePublished":"2016-05-12T07:00:16+00:00","dateModified":"2021-01-03T16:06:40+00:00","description":"After more than a century, Nepal has little to show from its attempts to tap the vast hydropower potential of its Himalayan rivers \u2013 are things finally about to change?","breadcrumb":{"@id":"https:\/\/dialogue.earth\/en\/energy\/nepals-eternal-quest-for-hydropower-challenges-and-quakes\/#breadcrumb"},"inLanguage":"en","potentialAction":[{"@type":"ReadAction","target":["https:\/\/dialogue.earth\/en\/energy\/nepals-eternal-quest-for-hydropower-challenges-and-quakes\/"]}]},{"@type":"ImageObject","inLanguage":"en","@id":"https:\/\/dialogue.earth\/en\/energy\/nepals-eternal-quest-for-hydropower-challenges-and-quakes\/#primaryimage","url":"https:\/\/dialogue.earth\/content\/uploads\/2016\/05\/15803710913_01adf7a8ca_k.jpg","contentUrl":"https:\/\/dialogue.earth\/content\/uploads\/2016\/05\/15803710913_01adf7a8ca_k.jpg","width":2048,"height":1365,"caption":"Kali Gandaki \"A\" Hydroelectric Project in Nepal. (Photo: Asian Development Bank)"},{"@type":"BreadcrumbList","@id":"https:\/\/dialogue.earth\/en\/energy\/nepals-eternal-quest-for-hydropower-challenges-and-quakes\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/dialogue.earth\/en\/"},{"@type":"ListItem","position":2,"name":"Nepal\u2019s eternal quest for hydropower \u2013 challenges and quakes"}]},{"@type":"WebSite","@id":"https:\/\/dialogue.earth\/en\/#website","url":"https:\/\/dialogue.earth\/en\/","name":"Dialogue Earth","description":"Global climate and environment news","publisher":{"@id":"https:\/\/dialogue.earth\/en\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/dialogue.earth\/en\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en"},{"@type":"Organization","@id":"https:\/\/dialogue.earth\/en\/#organization","name":"\u5bf9\u8bdd\u5730\u7403","url":"https:\/\/dialogue.earth\/en\/","logo":{"@type":"ImageObject","inLanguage":"en","@id":"https:\/\/dialogue.earth\/en\/#\/schema\/logo\/image\/","url":"https:\/\/dialogue.earth\/content\/uploads\/2024\/04\/Dialogue-Earth-Symbol-Logo_Black-Text.png","contentUrl":"https:\/\/dialogue.earth\/content\/uploads\/2024\/04\/Dialogue-Earth-Symbol-Logo_Black-Text.png","width":256,"height":256,"caption":"\u5bf9\u8bdd\u5730\u7403"},"image":{"@id":"https:\/\/dialogue.earth\/en\/#\/schema\/logo\/image\/"},"sameAs":["https:\/\/twitter.com\/DialogueEarth_","","https:\/\/www.facebook.com\/DialogueEarth.English","https:\/\/www.instagram.com\/dialogue.earth\/","https:\/\/www.linkedin.com\/company\/dialogueearth\/"],"publishingPrinciples":"https:\/\/dialogue.earth\/en\/about\/"},{"@type":"Person","@id":"https:\/\/dialogue.earth\/en\/#\/schema\/person\/697038c567af68386b9b2acf2eb79870","name":"Beth Walker","description":"Beth Walker is chinadialogue\u2019s culture editor. She is also editor of thethirdpole.net. She has researched and written about Asia\u2019s international rivers for many years, and has lived and worked in Yunnan province. She studied Chinese at Oxford University and Development Management at the London School of Economics. You can follow her on Twitter at @beth_wa","url":"https:\/\/dialogue.earth\/en\/author\/bethwalker\/","sameAs":["https:\/\/dialogue.earth\/en\/author\/christopher-butler\/"]}]}},"_links":{"self":[{"href":"https:\/\/dialogue.earth\/en\/wp-json\/wp\/v2\/posts\/20018827","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/dialogue.earth\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/dialogue.earth\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/dialogue.earth\/en\/wp-json\/wp\/v2\/users\/581"}],"replies":[{"embeddable":true,"href":"https:\/\/dialogue.earth\/en\/wp-json\/wp\/v2\/comments?post=20018827"}],"version-history":[{"count":0,"href":"https:\/\/dialogue.earth\/en\/wp-json\/wp\/v2\/posts\/20018827\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/dialogue.earth\/en\/wp-json\/wp\/v2\/media\/20018828"}],"wp:attachment":[{"href":"https:\/\/dialogue.earth\/en\/wp-json\/wp\/v2\/media?parent=20018827"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/dialogue.earth\/en\/wp-json\/wp\/v2\/categories?post=20018827"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/dialogue.earth\/en\/wp-json\/wp\/v2\/tags?post=20018827"},{"taxonomy":"hashtags","embeddable":true,"href":"https:\/\/dialogue.earth\/en\/wp-json\/wp\/v2\/hashtags?post=20018827"},{"taxonomy":"country","embeddable":true,"href":"https:\/\/dialogue.earth\/en\/wp-json\/wp\/v2\/country?post=20018827"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}