{"id":20074808,"date":"2021-06-23T12:30:00","date_gmt":"2021-06-23T07:00:00","guid":{"rendered":"https:\/\/www.thethirdpole.net\/?p=74808"},"modified":"2021-06-30T13:44:23","modified_gmt":"2021-06-30T08:14:23","slug":"another-tragedy-raises-ire-at-hydro-projects-in-himachal-pradesh","status":"publish","type":"post","link":"https:\/\/dialogue.earth\/en\/energy\/another-tragedy-raises-ire-at-hydro-projects-in-himachal-pradesh\/","title":{"rendered":"Another tragedy raises ire at hydro projects in Himachal Pradesh"},"content":{"rendered":"\n<p>The village of Palgi is mourning 27-year-old Amar Chand. He died on 21 May in an <a href=\"https:\/\/sandrp.in\/2021\/05\/22\/deaths-and-disaster-at-nhpcs-parbati-ii-hydro-project\/\">accident<\/a> inside a tunnel at the 800 MW <a href=\"http:\/\/www.nhpcindia.com\/Default.aspx?id=186&amp;lg=eng&amp;CatId=2&amp;ProjectId=13\">Parbati II hydroelectric project<\/a> (HEP), where he was working. The project is being built in the north Indian state of Himachal Pradesh, in Kullu district, where Palgi village is also located. Three other people died in the same accident; they were from Sirmaur district of Himachal Pradesh, Darjeeling in West Bengal, and Nepal.<\/p>\n\n\n\n<p>National Hydro Power Corporation (NHPC), an Indian government-owned utility, is building the hydropower station. LK Tripathi, the project head, told <a href=\"https:\/\/dialogue.earth\/\">The Third Pole<\/a> that a huge \u201cwedge\u201d fell on the victims from the roof of the tunnel during drilling work. \u201cNormally all the wedges are tightly secured with rock anchors and steel girders, and cemented. But it seems this wedge was somewhat loose, which caused the accident.\u201d<\/p>\n\n\n\n<p>District authorities and NHPC have promised compensation. Richa Verma, the top official in Kullu district, has ordered an inquiry into the accident.<\/p>\n\n\n\n<p>Amar\u2019s family remains inconsolable. His brother Roop Chand, 20, said no one had come from NHPC to offer condolences. \u201cWe lost our mother young. My father brought us up with great difficulty. We barely survived, with little income from a small farm.\u201d<\/p>\n\n\n\n<p>Amar had been working at the Parbati project for about eight months. He leaves behind a four-month-old child.<\/p>\n\n\n\n<p>Moti Ram Katwal, secretary of the local farmers\u2019 council, said: \u201cThese accidents at the HEP site are not new. Not long ago, we lost two other locals who got electrocuted while they were repairing a transmission line at the site.\u201d<\/p>\n\n\n\n<h2 class=\"wp-block-heading\" id=\"h-accident-prompts-wider-questions\">Accident prompts wider questions<\/h2>\n\n\n\n<p>Himanshu Thakkar, coordinator of NGO the South Asia Network on Dams, Rivers and People, told The Third Pole: \u201cSeveral such accidents at HEP sites and incidents of loss of lives and property have been happening in the Himalayan region due to landslides, massive soil erosion, illegal muck dumping, slope cutting etc, all triggered by these projects. But there is no central and state authority or monitoring mechanism in place. No punitive action is taken against HEP companies for their negligence.\u201d<\/p>\n\n\n\n<div class=\"wp-block-cd-story-image block--story-image\" itemscope itemtype=\"http:\/\/schema.org\/ImageObject\"><div class=\"block--story-image__column\"><div class=\"block--story-image__image\"><img class=\"lazy\" data-src=\"https:\/\/dialogue.earth\/content\/uploads\/2021\/06\/Landslide-Urni-village-Himachal-Pradesh-India-scaled.jpg\" data-srcset=\"https:\/\/dialogue.earth\/content\/uploads\/2021\/06\/Landslide-Urni-village-Himachal-Pradesh-India-768x512.jpg 768w, https:\/\/dialogue.earth\/content\/uploads\/2021\/06\/Landslide-Urni-village-Himachal-Pradesh-India-1024x682.jpg 1024w, https:\/\/dialogue.earth\/content\/uploads\/2021\/06\/Landslide-Urni-village-Himachal-Pradesh-India-1400x933.jpg 1400w, https:\/\/dialogue.earth\/content\/uploads\/2021\/06\/Landslide-Urni-village-Himachal-Pradesh-India-1800x1200.jpg 2000w, https:\/\/dialogue.earth\/content\/uploads\/2021\/06\/Landslide-Urni-village-Himachal-Pradesh-India-scaled.jpg\" data-sizes=\"(max-width: 600px) 768px, (max-width: 999px) 1024px, (max-width: 1400px) 1400px, (max-width: 2000px) 2000px, 2560px\" alt=\"Massive landslide at Urni village, Sumit Mahar\"\/><\/div><div class=\"block--story-image__content\"><div itemprop=\"caption\" class=\"block--story-image__caption\">A landslide at Urni village, close to the Karcham Wangtoo hydropower project site (Image: Sumit Mahar)<\/div><\/div><\/div><meta itemprop=\"contentUrl\" content=\"https:\/\/dialogue.earth\/content\/uploads\/2021\/06\/Landslide-Urni-village-Himachal-Pradesh-India-scaled.jpg\"\/><meta itemprop=\"contentSize\" content=\"1 MB\"\/><meta itemprop=\"height\" content=\"1706\"\/><meta itemprop=\"width\" content=\"2560\"\/><meta itemprop=\"author\"\/><meta itemprop=\"representativeOfPage\" content=\"true\"\/><\/div>\n\n\n\n<p>In August 2013, the Himachal Pradesh department of power and multipurpose projects passed a notification to create such a monitoring authority, Thakkar pointed out. No such body has yet appeared.<\/p>\n\n\n\n<p>Manshi Asher is a member of Himdhara, a Himachal Pradesh-\u200bbased environmental research and action collective. Asher said: \u201cThese projects are not financially viable as there are time and cost overruns. Then water depletion during winter, siltation during the monsoon and the impacts of climate change like glaciers receding and irregular rainfall cycle make them a losing proposition in the future. Companies have suffered significant revenue losses from these HEPs over the years.\u201d<\/p>\n\n\n\n<iframe src=\"https:\/\/flo.uri.sh\/visualisation\/6497505\/embed\" title=\"Interactive or visual content\" class=\"flourish-embed-iframe\" frameborder=\"0\" scrolling=\"no\" style=\"width:100%;height:600px;\" sandbox=\"allow-same-origin allow-forms allow-scripts allow-downloads allow-popups allow-popups-to-escape-sandbox allow-top-navigation-by-user-activation\"><\/iframe><div style=\"width:100%!;margin-top:4px!important;text-align:right!important;\"><\/div>\n\n\n\n<p>But Sreedhar Ramamurthi, a <a href=\"https:\/\/www.linkedin.com\/in\/sreedhar-ramamurthi-76928b13\/\">geoscientist<\/a> who has been working in this region of the Himalayas for three decades, said hydro companies are still making large profits. \u201cAfter paying loans and liabilities in the first few years, the companies only make a profit thereafter, as they get water as a free raw material.\u201d He gave the example of Jaypee, a private engineering company that <a href=\"https:\/\/www.business-standard.com\/article\/pti-stories\/jsw-energy-to-buy-2-hydro-projects-of-jp-power-for-rs-9700-cr-114111600404_1.html\">sold<\/a> two hydropower plants \u2013 Baspa II (300 MW) and Karcham Wangtoo (1,091 MW) \u2013 for 97 billion Indian rupees (USD 1.3 billion) in 2015. \u201cThe firm made a huge profit while local people are still suffering.\u201d<\/p>\n\n\n\n<p>India does not need the electricity from the hydro projects, Ramamurthi pointed out. \u201cThere is already 25,000 MW of <a href=\"https:\/\/ieefa.org\/ieefa-theres-no-way-out-for-indias-stranded-thermal-power-assets\/\">surplus energy<\/a>. We don\u2019t need to create more energy, especially in the Himalayas.\u201d<\/p>\n\n\n\n<div class=\"wp-block-columns is-layout-flex wp-container-core-columns-is-layout-9d6595d7 wp-block-columns-is-layout-flex\">\n<div class=\"wp-block-column is-layout-flow wp-block-column-is-layout-flow\">\n<a class=\"wp-block-cd-related-news alignright block--related-news loading\" data-post-id=\"20035745\"><div class=\"block--related-news__image\"><\/div><div class=\"block--related-news__content\"><span class=\"block--related-news__heading\">Recommended<\/span><span class=\"block--related-news__title\"><\/span><\/div><\/a>\n<\/div>\n\n\n\n<div class=\"wp-block-column is-layout-flow wp-block-column-is-layout-flow\">\n<a class=\"wp-block-cd-related-news alignright block--related-news loading\" data-post-id=\"20034726\"><div class=\"block--related-news__image\"><\/div><div class=\"block--related-news__content\"><span class=\"block--related-news__heading\">Recommended<\/span><span class=\"block--related-news__title\"><\/span><\/div><\/a>\n<\/div>\n<\/div>\n\n\n\n<h2 class=\"wp-block-heading\" id=\"h-livelihoods-wrecked\">Livelihoods wrecked<\/h2>\n\n\n\n<p>There are complaints about hydropower project sites across Himachal Pradesh. Geeta Gyani is the former head of Urni village, close to the Karcham Wangtoo project site. \u201cThis project upturned our lives,\u201d Gyani told The Third Pole. \u201cThe reckless muck dumping destroyed 32 apple orchards, which people had nurtured like small children. We depended on the orchards for our livelihoods.<\/p>\n\n\n\n<p>\u201cThe water flow in the [village] stream was disrupted at many places and the water pipe was broken too. Women had to fetch water from far away for a long time, until we got the pipe repaired with collective labour of youngsters in the village.\u201d She also said that the reverberations from tunnelling have caused many houses to develop cracks.<\/p>\n\n\n\n<div class=\"wp-block-cd-story-image block--story-image\" itemscope itemtype=\"http:\/\/schema.org\/ImageObject\"><div class=\"block--story-image__column\"><div class=\"block--story-image__image\"><img class=\"lazy\" data-src=\"https:\/\/dialogue.earth\/content\/uploads\/2021\/06\/Karcham-Wangtoo-hydroelectric-project-Himachal-Pradesh-India-scaled.jpg\" data-srcset=\"https:\/\/dialogue.earth\/content\/uploads\/2021\/06\/Karcham-Wangtoo-hydroelectric-project-Himachal-Pradesh-India-768x512.jpg 768w, https:\/\/dialogue.earth\/content\/uploads\/2021\/06\/Karcham-Wangtoo-hydroelectric-project-Himachal-Pradesh-India-1024x683.jpg 1024w, https:\/\/dialogue.earth\/content\/uploads\/2021\/06\/Karcham-Wangtoo-hydroelectric-project-Himachal-Pradesh-India-1400x933.jpg 1400w, https:\/\/dialogue.earth\/content\/uploads\/2021\/06\/Karcham-Wangtoo-hydroelectric-project-Himachal-Pradesh-India-1800x1200.jpg 2000w, https:\/\/dialogue.earth\/content\/uploads\/2021\/06\/Karcham-Wangtoo-hydroelectric-project-Himachal-Pradesh-India-scaled.jpg\" data-sizes=\"(max-width: 600px) 768px, (max-width: 999px) 1024px, (max-width: 1400px) 1400px, (max-width: 2000px) 2000px, 2560px\" alt=\"Karcham Wangtoo project site, Sumit Mahar\"\/><\/div><div class=\"block--story-image__content\"><div itemprop=\"caption\" class=\"block--story-image__caption\">The 1,091 MW Karcham Wangtoo hydropower station (Image: Sumit Mahar)<\/div><\/div><\/div><meta itemprop=\"contentUrl\" content=\"https:\/\/dialogue.earth\/content\/uploads\/2021\/06\/Karcham-Wangtoo-hydroelectric-project-Himachal-Pradesh-India-scaled.jpg\"\/><meta itemprop=\"contentSize\" content=\"730 KB\"\/><meta itemprop=\"height\" content=\"1707\"\/><meta itemprop=\"width\" content=\"2560\"\/><meta itemprop=\"author\"\/><meta itemprop=\"representativeOfPage\" content=\"true\"\/><\/div>\n\n\n\n<p>Jiya Negi, who lives in the Kalpa area of Kinnaur district, described how the 450 MW Shongtong Karchham project affected residents\u2019 livelihoods. The engineering work to the river impacted crops of apples and pine nuts, Negi said, adding, \u201cthe plantations were spoiled\u201d.<\/p>\n\n\n\n<div class=\"wp-block-cd-article-image aligncenter block--article-image\" itemscope itemtype=\"http:\/\/schema.org\/ImageObject\"><div class=\"block--article-image__column\"><div class=\"block--article-image__image\"><img class=\"lazy\" data-src=\"https:\/\/dialogue.earth\/content\/uploads\/2021\/06\/20210622_HP-map_English_v1Mapboard_1@2x-1.png\" data-srcset=\"https:\/\/dialogue.earth\/content\/uploads\/2021\/06\/20210622_HP-map_English_v1Mapboard_1@2x-1-768x538.png 768w, https:\/\/dialogue.earth\/content\/uploads\/2021\/06\/20210622_HP-map_English_v1Mapboard_1@2x-1-1024x717.png 1024w, https:\/\/dialogue.earth\/content\/uploads\/2021\/06\/20210622_HP-map_English_v1Mapboard_1@2x-1.png 3714w\" data-sizes=\"(max-width: 600px) 768px, (max-width: 1024px) 1024px, 3714px\" alt=\"\"\/><\/div><div class=\"block--article-image__content\"><div itemprop=\"caption\" class=\"block--article-image__caption\">Some of the HEP sites in Himachal Pradesh<\/div><\/div><\/div><meta itemprop=\"contentUrl\" content=\"https:\/\/dialogue.earth\/content\/uploads\/2021\/06\/20210622_HP-map_English_v1Mapboard_1@2x-1.png\"\/><meta itemprop=\"contentSize\" content=\"331 KB\"\/><meta itemprop=\"height\" content=\"2601\"\/><meta itemprop=\"width\" content=\"3714\"\/><meta itemprop=\"author\"\/><meta itemprop=\"representativeOfPage\" content=\"true\"\/><\/div>\n\n\n\n<p>In 2019, Himdhara, the local NGO, published a <a href=\"http:\/\/www.himdhara.org\/wp-content\/uploads\/2019\/06\/The-Hidden-Cost-of-Hydropower_2019.pdf\">report<\/a> on environmental hazards caused by hydropower in Himachal Pradesh. The report lists <a href=\"https:\/\/dialogue.earth\/en\/energy\/hydropower-projects-ruing-lives-in-the-himalayas\/\">four major impacts<\/a>:<\/p>\n\n\n\n<ul class=\"wp-block-list\"><li>Geological impacts \u2013 triggering of landslides\/slope failures leading to damage of roads, farms, houses<\/li><li>Hydrogeological impacts \u2013 drying of springs and underground water sources<\/li><li>Muck dumping along rivers leading to increased siltation in forests and pastures<\/li><li>Safety negligence leading to accidents<\/li><\/ul>\n\n\n\n<h2 class=\"wp-block-heading\" id=\"h-no-benefit-to-residents\">No benefit to residents<\/h2>\n\n\n\n<p>Anshul Sharma, senior executive engineer at the Himachal Pradesh Directorate of Energy, said the state government\u2019s policy is that companies executing hydro projects must share the benefits with local people for 10 years after commissioning. This includes 1.5% of the profit for the local area development fund and another 1% as cash incentives.<\/p>\n\n\n\n<a class=\"wp-block-cd-related-news alignright block--related-news loading\" data-post-id=\"20028295\"><div class=\"block--related-news__image\"><\/div><div class=\"block--related-news__content\"><span class=\"block--related-news__heading\">Recommended<\/span><span class=\"block--related-news__title\"><\/span><\/div><\/a>\n\n\n\n<p>Geeta Gyani from Urni village said the policy remains only on paper. \u201cThere are 225 families living here. Those who got no compensation for losses are fighting for it since 2014. Our village continues to be vulnerable. The company did no development work here.\u201d<\/p>\n\n\n\n<div class=\"wp-block-cd-story-image block--story-image\" itemscope itemtype=\"http:\/\/schema.org\/ImageObject\"><div class=\"block--story-image__column\"><div class=\"block--story-image__image\"><img class=\"lazy\" data-src=\"https:\/\/dialogue.earth\/content\/uploads\/2021\/06\/House-above-HRT-Chanju-HEP-Himachal-Pradesh-India.jpg\" data-srcset=\"https:\/\/dialogue.earth\/content\/uploads\/2021\/06\/House-above-HRT-Chanju-HEP-Himachal-Pradesh-India-768x513.jpg 768w, https:\/\/dialogue.earth\/content\/uploads\/2021\/06\/House-above-HRT-Chanju-HEP-Himachal-Pradesh-India.jpg\" data-sizes=\"1022px\" alt=\"House located above the head race tunnel of Chanju hydropower project, Sumit Mahar\"\/><\/div><div class=\"block--story-image__content\"><div itemprop=\"caption\" class=\"block--story-image__caption\">Cracks in a house that is above the head race tunnel of the Chanju hydropower project (Image: Sumit Mahar)<\/div><\/div><\/div><meta itemprop=\"contentUrl\" content=\"https:\/\/dialogue.earth\/content\/uploads\/2021\/06\/House-above-HRT-Chanju-HEP-Himachal-Pradesh-India.jpg\"\/><meta itemprop=\"contentSize\" content=\"495 KB\"\/><meta itemprop=\"height\" content=\"682\"\/><meta itemprop=\"width\" content=\"1022\"\/><meta itemprop=\"author\"\/><meta itemprop=\"representativeOfPage\" content=\"true\"\/><\/div>\n\n\n\n<h2 class=\"wp-block-heading\" id=\"h-hydropower-risks-across-himachal-pradesh\">Hydropower risks across Himachal Pradesh<\/h2>\n\n\n\n<p>The risks from hydropower projects extend to the trans-Himalayan part of Himachal Pradesh, the Lahaul and Spiti region that is geographically part of the Tibetan Plateau. There are 20 hydroelectric projects planned in this region, according to the Indian government\u2019s Central Electricity Authority. The entire region used to be cut off by heavy snowfall every winter. Since the opening of an all-weather road tunnel, it is now connected at all times to the rest of India. Residents fear this will make it easier to build hydropower plants, despite their opposition. <\/p>\n\n\n\n<p>Rigzin Heyreppa is president of Jispa Dam Sangharsh Samiti, a group of residents opposing the Jispa dam project in Lahaul and Spiti. He said: \u201cWe have been fighting against Jispa HEP (300 MW) for over a decade. Under this project a 9-km tunnel will go under 14 villages. The blasting and the tunnel will cause immense damage to our houses, agricultural land and environment\u2026 The state government should allow us to live in peace and prosper through tourism.\u201d<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Many more hydropower stations are still being planned in the Himalayan state, despite reports of the death and destruction the often loss-making projects inflict<\/p>\n","protected":false},"author":20000286,"featured_media":20074815,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[757],"tags":[20000022,554,556,50040707],"hashtags":[],"country":[20000111],"class_list":["post-20074808","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-energy","tag-himalayas","tag-hydropower","tag-infrastructure","tag-the-third-pole","country-india"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v26.0 (Yoast SEO v26.0) - https:\/\/yoast.com\/wordpress\/plugins\/seo\/ -->\n<title>Another tragedy raises ire at hydropower projects in Himachal Pradesh<\/title>\n<meta name=\"description\" content=\"Many hydropower stations are still being planned in Himachal Pradesh, despite the death and destruction the projects inflict\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/dialogue.earth\/en\/energy\/another-tragedy-raises-ire-at-hydro-projects-in-himachal-pradesh\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Another tragedy raises ire at hydro projects in Himachal Pradesh\" \/>\n<meta property=\"og:description\" content=\"Many more hydropower stations are still being planned in the Himalayan state, despite reports of the death and destruction the often loss-making projects inflict\" \/>\n<meta property=\"og:url\" content=\"https:\/\/dialogue.earth\/en\/energy\/another-tragedy-raises-ire-at-hydro-projects-in-himachal-pradesh\/\" \/>\n<meta property=\"og:site_name\" content=\"Dialogue Earth\" \/>\n<meta property=\"article:published_time\" content=\"2021-06-23T07:00:00+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2021-06-30T08:14:23+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/dialogue.earth\/content\/uploads\/2021\/06\/Parbati-II-hydropower-project-Barshaini-Kullu-Himachal-Pradesh-India-1-scaled.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"2560\" \/>\n\t<meta property=\"og:image:height\" content=\"1707\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"Natalie Taylor\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\/\/dialogue.earth\/en\/energy\/another-tragedy-raises-ire-at-hydro-projects-in-himachal-pradesh\/#article\",\"isPartOf\":{\"@id\":\"https:\/\/dialogue.earth\/en\/energy\/another-tragedy-raises-ire-at-hydro-projects-in-himachal-pradesh\/\"},\"author\":{\"name\":\"Natalie Taylor\",\"@id\":\"https:\/\/dialogue.earth\/en\/#\/schema\/person\/669bbcbea17ca34b387a70d2889092dd\"},\"headline\":\"Another tragedy raises ire at hydro projects in Himachal Pradesh\",\"datePublished\":\"2021-06-23T07:00:00+00:00\",\"dateModified\":\"2021-06-30T08:14:23+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\/\/dialogue.earth\/en\/energy\/another-tragedy-raises-ire-at-hydro-projects-in-himachal-pradesh\/\"},\"wordCount\":1132,\"commentCount\":0,\"publisher\":{\"@id\":\"https:\/\/dialogue.earth\/en\/#organization\"},\"image\":{\"@id\":\"https:\/\/dialogue.earth\/en\/energy\/another-tragedy-raises-ire-at-hydro-projects-in-himachal-pradesh\/#primaryimage\"},\"thumbnailUrl\":\"https:\/\/dialogue.earth\/content\/uploads\/2021\/06\/Parbati-II-hydropower-project-Barshaini-Kullu-Himachal-Pradesh-India-1-scaled.jpg\",\"keywords\":[\"Himalayas\",\"Hydropower\",\"Infrastructure\",\"The Third Pole\"],\"articleSection\":[\"Energy\"],\"inLanguage\":\"en\",\"potentialAction\":[{\"@type\":\"CommentAction\",\"name\":\"Comment\",\"target\":[\"https:\/\/dialogue.earth\/en\/energy\/another-tragedy-raises-ire-at-hydro-projects-in-himachal-pradesh\/#respond\"]}]},{\"@type\":\"WebPage\",\"@id\":\"https:\/\/dialogue.earth\/en\/energy\/another-tragedy-raises-ire-at-hydro-projects-in-himachal-pradesh\/\",\"url\":\"https:\/\/dialogue.earth\/en\/energy\/another-tragedy-raises-ire-at-hydro-projects-in-himachal-pradesh\/\",\"name\":\"Another tragedy raises ire at hydropower projects in Himachal Pradesh\",\"isPartOf\":{\"@id\":\"https:\/\/dialogue.earth\/en\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\/\/dialogue.earth\/en\/energy\/another-tragedy-raises-ire-at-hydro-projects-in-himachal-pradesh\/#primaryimage\"},\"image\":{\"@id\":\"https:\/\/dialogue.earth\/en\/energy\/another-tragedy-raises-ire-at-hydro-projects-in-himachal-pradesh\/#primaryimage\"},\"thumbnailUrl\":\"https:\/\/dialogue.earth\/content\/uploads\/2021\/06\/Parbati-II-hydropower-project-Barshaini-Kullu-Himachal-Pradesh-India-1-scaled.jpg\",\"datePublished\":\"2021-06-23T07:00:00+00:00\",\"dateModified\":\"2021-06-30T08:14:23+00:00\",\"description\":\"Many hydropower stations are still being planned in Himachal Pradesh, despite the death and destruction the projects inflict\",\"breadcrumb\":{\"@id\":\"https:\/\/dialogue.earth\/en\/energy\/another-tragedy-raises-ire-at-hydro-projects-in-himachal-pradesh\/#breadcrumb\"},\"inLanguage\":\"en\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/dialogue.earth\/en\/energy\/another-tragedy-raises-ire-at-hydro-projects-in-himachal-pradesh\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en\",\"@id\":\"https:\/\/dialogue.earth\/en\/energy\/another-tragedy-raises-ire-at-hydro-projects-in-himachal-pradesh\/#primaryimage\",\"url\":\"https:\/\/dialogue.earth\/content\/uploads\/2021\/06\/Parbati-II-hydropower-project-Barshaini-Kullu-Himachal-Pradesh-India-1-scaled.jpg\",\"contentUrl\":\"https:\/\/dialogue.earth\/content\/uploads\/2021\/06\/Parbati-II-hydropower-project-Barshaini-Kullu-Himachal-Pradesh-India-1-scaled.jpg\",\"width\":2560,\"height\":1707,\"caption\":\"The Parbati II hydroelectric project in Himachal Pradesh, where 27-year-old Amar Chand was killed recently in an accident (Image: Sumit Mahar)\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\/\/dialogue.earth\/en\/energy\/another-tragedy-raises-ire-at-hydro-projects-in-himachal-pradesh\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\/\/dialogue.earth\/en\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Another tragedy raises ire at hydro projects in Himachal Pradesh\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\/\/dialogue.earth\/en\/#website\",\"url\":\"https:\/\/dialogue.earth\/en\/\",\"name\":\"Dialogue Earth\",\"description\":\"Global climate and environment news\",\"publisher\":{\"@id\":\"https:\/\/dialogue.earth\/en\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\/\/dialogue.earth\/en\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en\"},{\"@type\":\"Organization\",\"@id\":\"https:\/\/dialogue.earth\/en\/#organization\",\"name\":\"\u5bf9\u8bdd\u5730\u7403\",\"url\":\"https:\/\/dialogue.earth\/en\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en\",\"@id\":\"https:\/\/dialogue.earth\/en\/#\/schema\/logo\/image\/\",\"url\":\"https:\/\/dialogue.earth\/content\/uploads\/2024\/04\/Dialogue-Earth-Symbol-Logo_Black-Text.png\",\"contentUrl\":\"https:\/\/dialogue.earth\/content\/uploads\/2024\/04\/Dialogue-Earth-Symbol-Logo_Black-Text.png\",\"width\":256,\"height\":256,\"caption\":\"\u5bf9\u8bdd\u5730\u7403\"},\"image\":{\"@id\":\"https:\/\/dialogue.earth\/en\/#\/schema\/logo\/image\/\"},\"sameAs\":[\"https:\/\/twitter.com\/DialogueEarth_\",\"\",\"https:\/\/www.facebook.com\/DialogueEarth.English\",\"https:\/\/www.instagram.com\/dialogue.earth\/\",\"https:\/\/www.linkedin.com\/company\/dialogueearth\/\"],\"publishingPrinciples\":\"https:\/\/dialogue.earth\/en\/about\/\"},{\"@type\":\"Person\",\"@id\":\"https:\/\/dialogue.earth\/en\/#\/schema\/person\/669bbcbea17ca34b387a70d2889092dd\",\"name\":\"Natalie Taylor\",\"description\":\"Natalie Taylor is assistant editor at The Third Pole. She previously worked for eight years as a production editor and sub-editor at companies including Dow Jones and the Financial Times. She is studying for a master\u2019s in Environmental Law, Policy and Governance at Birkbeck, University of London.\",\"url\":\"https:\/\/dialogue.earth\/en\/author\/natalie-taylorthethirdpole-net\/\",\"sameAs\":[\"https:\/\/dialogue.earth\/en\/author\/seema-sharma\/\"]}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"Another tragedy raises ire at hydropower projects in Himachal Pradesh","description":"Many hydropower stations are still being planned in Himachal Pradesh, despite the death and destruction the projects inflict","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/dialogue.earth\/en\/energy\/another-tragedy-raises-ire-at-hydro-projects-in-himachal-pradesh\/","og_locale":"en_US","og_type":"article","og_title":"Another tragedy raises ire at hydro projects in Himachal Pradesh","og_description":"Many more hydropower stations are still being planned in the Himalayan state, despite reports of the death and destruction the often loss-making projects inflict","og_url":"https:\/\/dialogue.earth\/en\/energy\/another-tragedy-raises-ire-at-hydro-projects-in-himachal-pradesh\/","og_site_name":"Dialogue Earth","article_published_time":"2021-06-23T07:00:00+00:00","article_modified_time":"2021-06-30T08:14:23+00:00","og_image":[{"width":2560,"height":1707,"url":"https:\/\/dialogue.earth\/content\/uploads\/2021\/06\/Parbati-II-hydropower-project-Barshaini-Kullu-Himachal-Pradesh-India-1-scaled.jpg","type":"image\/jpeg"}],"author":"Natalie Taylor","twitter_card":"summary_large_image","schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/dialogue.earth\/en\/energy\/another-tragedy-raises-ire-at-hydro-projects-in-himachal-pradesh\/#article","isPartOf":{"@id":"https:\/\/dialogue.earth\/en\/energy\/another-tragedy-raises-ire-at-hydro-projects-in-himachal-pradesh\/"},"author":{"name":"Natalie Taylor","@id":"https:\/\/dialogue.earth\/en\/#\/schema\/person\/669bbcbea17ca34b387a70d2889092dd"},"headline":"Another tragedy raises ire at hydro projects in Himachal Pradesh","datePublished":"2021-06-23T07:00:00+00:00","dateModified":"2021-06-30T08:14:23+00:00","mainEntityOfPage":{"@id":"https:\/\/dialogue.earth\/en\/energy\/another-tragedy-raises-ire-at-hydro-projects-in-himachal-pradesh\/"},"wordCount":1132,"commentCount":0,"publisher":{"@id":"https:\/\/dialogue.earth\/en\/#organization"},"image":{"@id":"https:\/\/dialogue.earth\/en\/energy\/another-tragedy-raises-ire-at-hydro-projects-in-himachal-pradesh\/#primaryimage"},"thumbnailUrl":"https:\/\/dialogue.earth\/content\/uploads\/2021\/06\/Parbati-II-hydropower-project-Barshaini-Kullu-Himachal-Pradesh-India-1-scaled.jpg","keywords":["Himalayas","Hydropower","Infrastructure","The Third Pole"],"articleSection":["Energy"],"inLanguage":"en","potentialAction":[{"@type":"CommentAction","name":"Comment","target":["https:\/\/dialogue.earth\/en\/energy\/another-tragedy-raises-ire-at-hydro-projects-in-himachal-pradesh\/#respond"]}]},{"@type":"WebPage","@id":"https:\/\/dialogue.earth\/en\/energy\/another-tragedy-raises-ire-at-hydro-projects-in-himachal-pradesh\/","url":"https:\/\/dialogue.earth\/en\/energy\/another-tragedy-raises-ire-at-hydro-projects-in-himachal-pradesh\/","name":"Another tragedy raises ire at hydropower projects in Himachal Pradesh","isPartOf":{"@id":"https:\/\/dialogue.earth\/en\/#website"},"primaryImageOfPage":{"@id":"https:\/\/dialogue.earth\/en\/energy\/another-tragedy-raises-ire-at-hydro-projects-in-himachal-pradesh\/#primaryimage"},"image":{"@id":"https:\/\/dialogue.earth\/en\/energy\/another-tragedy-raises-ire-at-hydro-projects-in-himachal-pradesh\/#primaryimage"},"thumbnailUrl":"https:\/\/dialogue.earth\/content\/uploads\/2021\/06\/Parbati-II-hydropower-project-Barshaini-Kullu-Himachal-Pradesh-India-1-scaled.jpg","datePublished":"2021-06-23T07:00:00+00:00","dateModified":"2021-06-30T08:14:23+00:00","description":"Many hydropower stations are still being planned in Himachal Pradesh, despite the death and destruction the projects inflict","breadcrumb":{"@id":"https:\/\/dialogue.earth\/en\/energy\/another-tragedy-raises-ire-at-hydro-projects-in-himachal-pradesh\/#breadcrumb"},"inLanguage":"en","potentialAction":[{"@type":"ReadAction","target":["https:\/\/dialogue.earth\/en\/energy\/another-tragedy-raises-ire-at-hydro-projects-in-himachal-pradesh\/"]}]},{"@type":"ImageObject","inLanguage":"en","@id":"https:\/\/dialogue.earth\/en\/energy\/another-tragedy-raises-ire-at-hydro-projects-in-himachal-pradesh\/#primaryimage","url":"https:\/\/dialogue.earth\/content\/uploads\/2021\/06\/Parbati-II-hydropower-project-Barshaini-Kullu-Himachal-Pradesh-India-1-scaled.jpg","contentUrl":"https:\/\/dialogue.earth\/content\/uploads\/2021\/06\/Parbati-II-hydropower-project-Barshaini-Kullu-Himachal-Pradesh-India-1-scaled.jpg","width":2560,"height":1707,"caption":"The Parbati II hydroelectric project in Himachal Pradesh, where 27-year-old Amar Chand was killed recently in an accident (Image: Sumit Mahar)"},{"@type":"BreadcrumbList","@id":"https:\/\/dialogue.earth\/en\/energy\/another-tragedy-raises-ire-at-hydro-projects-in-himachal-pradesh\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/dialogue.earth\/en\/"},{"@type":"ListItem","position":2,"name":"Another tragedy raises ire at hydro projects in Himachal Pradesh"}]},{"@type":"WebSite","@id":"https:\/\/dialogue.earth\/en\/#website","url":"https:\/\/dialogue.earth\/en\/","name":"Dialogue Earth","description":"Global climate and environment news","publisher":{"@id":"https:\/\/dialogue.earth\/en\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/dialogue.earth\/en\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en"},{"@type":"Organization","@id":"https:\/\/dialogue.earth\/en\/#organization","name":"\u5bf9\u8bdd\u5730\u7403","url":"https:\/\/dialogue.earth\/en\/","logo":{"@type":"ImageObject","inLanguage":"en","@id":"https:\/\/dialogue.earth\/en\/#\/schema\/logo\/image\/","url":"https:\/\/dialogue.earth\/content\/uploads\/2024\/04\/Dialogue-Earth-Symbol-Logo_Black-Text.png","contentUrl":"https:\/\/dialogue.earth\/content\/uploads\/2024\/04\/Dialogue-Earth-Symbol-Logo_Black-Text.png","width":256,"height":256,"caption":"\u5bf9\u8bdd\u5730\u7403"},"image":{"@id":"https:\/\/dialogue.earth\/en\/#\/schema\/logo\/image\/"},"sameAs":["https:\/\/twitter.com\/DialogueEarth_","","https:\/\/www.facebook.com\/DialogueEarth.English","https:\/\/www.instagram.com\/dialogue.earth\/","https:\/\/www.linkedin.com\/company\/dialogueearth\/"],"publishingPrinciples":"https:\/\/dialogue.earth\/en\/about\/"},{"@type":"Person","@id":"https:\/\/dialogue.earth\/en\/#\/schema\/person\/669bbcbea17ca34b387a70d2889092dd","name":"Natalie Taylor","description":"Natalie Taylor is assistant editor at The Third Pole. She previously worked for eight years as a production editor and sub-editor at companies including Dow Jones and the Financial Times. She is studying for a master\u2019s in Environmental Law, Policy and Governance at Birkbeck, University of London.","url":"https:\/\/dialogue.earth\/en\/author\/natalie-taylorthethirdpole-net\/","sameAs":["https:\/\/dialogue.earth\/en\/author\/seema-sharma\/"]}]}},"_links":{"self":[{"href":"https:\/\/dialogue.earth\/en\/wp-json\/wp\/v2\/posts\/20074808","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/dialogue.earth\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/dialogue.earth\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/dialogue.earth\/en\/wp-json\/wp\/v2\/users\/20000286"}],"replies":[{"embeddable":true,"href":"https:\/\/dialogue.earth\/en\/wp-json\/wp\/v2\/comments?post=20074808"}],"version-history":[{"count":0,"href":"https:\/\/dialogue.earth\/en\/wp-json\/wp\/v2\/posts\/20074808\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/dialogue.earth\/en\/wp-json\/wp\/v2\/media\/20074815"}],"wp:attachment":[{"href":"https:\/\/dialogue.earth\/en\/wp-json\/wp\/v2\/media?parent=20074808"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/dialogue.earth\/en\/wp-json\/wp\/v2\/categories?post=20074808"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/dialogue.earth\/en\/wp-json\/wp\/v2\/tags?post=20074808"},{"taxonomy":"hashtags","embeddable":true,"href":"https:\/\/dialogue.earth\/en\/wp-json\/wp\/v2\/hashtags?post=20074808"},{"taxonomy":"country","embeddable":true,"href":"https:\/\/dialogue.earth\/en\/wp-json\/wp\/v2\/country?post=20074808"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}